Education | Modular Classroom

Belen Soto Elementary

Litchfield, AZ
5,340 sqft.

This modular classroom facility was delivered through the Mohave Educational Services Cooperative contract, allowing procurement to be streamlined and the project to be completed on an accelerated schedule. The building was delivered on time, ensuring students were welcomed into their new classrooms at the start of the school year.

Structurally, project features 2 story masonry classrooms with steel deck over SJI steel joist roof framing and composite concrete-steel deck and wide flange beam floor system. A continuous steel framed bridge was designed to connect classrooms with construction / separation joints between structures to isolate thermal movement and load transfer between buildings. Single story gymnasium and administrative buildings utilized wood framed roof assemblies with structural insulation panels supported by masonry walls and tee shaped steel beams with double channel steel columns at exterior features. Buildings were founded on conventional concrete spread footings

Architect: Orcutt Winslow (Grace Design Studios)
General Contractor: Chasse Building Team
photo disclaimer
Specifications

Project Details

Design & Construction

  • Custom-designed modular building tailored to a constrained campus site
  • Steel-frame construction with slab-on-grade foundation
  • Site-installed finishes that integrate seamlessly with existing campus buildings
  • Modular solution designed to appear permanent and cohesive within its surroundings

Project Highlights

  • Exceeded program requirements by accommodating an additional classroom within limited space
  • Efficient delivery model balanced speed, quality, and cost-effectiveness
  • Demonstrates the flexibility and adaptability of modular construction for educational environments

Delivery Method

  • Delivered via the Mohave Educational Services Cooperative contract
  • Design-build approach ensured schedule certainty and minimal campus disruption
Completed Projects

Project Portfolio

Kingdom Structural's Work